Built right next to the new incinerator at Tuas, this wharf serves as the
gateway for refuse loads bound for the Pulau Semakau Offshore Landfill
dumping ground. Designed by Specs Consultants for the Ministry of
Environment and undertaken by a Penta-Koon joint-venture effort, this wharf
was completed in late 1998 is now fully operational.
An approximate area of 115,000 square metres of concrete of the wharf
structure, notably the piles, pilecaps, soffit etc. were impregnated
with Dry-Treat BHN IBTEO silane against the hostile marine
conditions.
|