The downtown core development project at Marina Bay on a previously reclaimed land
entails the construction of the drainage refrastructure network for the future Shenton Way business district extension.
Built for the Ministry of Environment by Quek & Quek Civil Engineering Pte Ltd, this
project is slated for completion early 2001. An approximate area of 16,500 square metres
will be treated with Dry-Treat BHN IBTEO silane, including all internal and external walls and bottom slab of the collector drains above zero tide level. |
|
 |